You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Pasadena Diturap
.
photo Nurito - Beritajakarta.id

Pasadena Connecting Channel Plastered

Pacuan Kuda Pulomas area, East Jakarta keeps being arranged towards Asean Games 2018. One of the efforts is dredging and installing plaster along Pasadena connecting channel.

Channel to be dredged and plastered is about 1.6 kilometer

Ahmad Yazied Bustomi, East Jakarta Head Sub-dept. of Water Management, admitted the project is implemented in front of Pacuan Kuda Pulomas.

“Channel to be dredged and plastered is about 1.6 kilometer,” he said, Wednesday (4/20).

30 PPSU Personnel Cleaned Pulomas Debris

According to him, plastering project is divided into two sides, west and east. Each side to be plastered is 800 meters with two meters of height above water surface and 50 cm into the channel bottom.

The project has been started since a month ago and it is targeted to complete this April.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1045 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye908 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye554 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye450 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing